The bridge’s prefabricated plate cross girders were delivered to the site and connected to the edge girders by a bolted cover plate splice connection. The concrete road deck has been constructed from precast panels fixed to the cross girders by in-situ concrete stitch pours.The dynamic curvature of the bridge’s supporting piers and abutments taper into its primary arches and road deck, defining a

Status
Closed
Sector
Airport, Cement, Seaport, Wind, Bridge, Road, Residential, Steel, Metal, Commercial
Location
China
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about Jiangxi River Bridge / Zaha Hadid Architects

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Jiangxi River Bridge / Zaha Hadid Architects” is an infrastructure initiative in the Airport sector, located in China. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The bridge’s prefabricated plate cross girders were delivered to the site and connected to the edge girders by a bolted cover plate splice connection. The concrete road deck has been constructed from precast panels fixed to the cross girders by in-situ concrete stitch pours.The dynamic curvature of the bridge’s supporting piers and abutments taper into its primary arches and road deck, defining a sculptural landmark withinChengdu’s transport infrastructure.Concrete abutments at either end of the bridge incorporate connectors linking the road deck to the West Line Road’s surface. With no foundations positioned in the Jiangxi River, intermediate piers are located beneath the springing points of the arches on each riverbank.Commissioned to build the bridge following the 2019 design competition, Zaha Hadid Architects (ZHA) used structural analysis software on the design’s digital model. Examining all material self-weight, superimposed dead load, and traffic live loading, as well as environmental considerations of wind and temperature, this analysis ensured the structure and foundations have been designed to exceed the standards required for once-in-200-year weather events.Mobile cranes lifted all prefabricated steelwork and precast concrete elements within the bridge’s short assembly schedule. TheChengduWest First Bridge crossing the Jiangxi River will open to the public upon completion of the West Line Road.With a height-to-span ratio of approximately 1:6, the bridge’s arches rise to 30 meters and are tied together at their base by longitudinal box girders that run along the edge of the road deck. These ties resist the outward horizontal thrust of each arch and significantly reduce the horizontal loads on the bridge’s foundations.Text description provided by the architects.The first in a series of bridges on Chengdu's West Line Road, the 295-meterChengduWest First Bridge crosses the Jiangxi River, a tributary of the Tuojiang River in China’s Sichuan province. With its 185-meter central span and 55-meter secondary spans reaching the riverbanks, the Chengdu West First Bridge is a road, cycle, and pedestrian bridge over the meandering Jiangxi River; enabling the West Line Road to become the western section of the Airport New Town ring-road and cycle route.As arches provide the most efficient bridge structure for spans between 120-250 meters, this symmetrical bridge is composed of two primary steel arches that rise from either side of the road deck. As they rise, the arches lean together to touch tangentially at their crown, stabilizing the structure from lateral wind forces.The bridge’s bored piles and abutments were constructed using conventional in-situ reinforced concrete techniques. The steel box sections of each arch were prefabricated in optimal dimensions for transportation and assembly on site. The edge box girder sections within the road deck include the cable anchorages. These sections were also prefabricated and delivered in sections to be spliced together with on-site welding.

Location

Country

China

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Airport, Cement, Seaport, Wind, Bridge, Road, Residential, Steel, Metal, Commercial

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project