Jiangxi Shihutang Navigation and Hydropower Complex Project
Sector: Water Supply and Storage • Location: China
Source: World Bank Group
The development objective of the Jiangxi Shihutang Navigation and Hydropower Complex Project for China is to improve utilization of the Gan River for more reliable freight transport and for cleaner energy production through: (a) improving inland waterway transport capacity and service levels for primary and secondary industries in the Nanchang-Ganzhou corridor of the Gan River; and (b) generating
- Status
- Closed
- Sector
- Water Supply and Storage, Fertilizers, Power Generation (CCGT), Waste Processing and Treatment, Seaport, Commercial, Hydro, Government
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Jiangxi Shihutang Navigation and Hydropower Complex Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of the Jiangxi Shihutang Navigation and Hydropower Complex Project for China is to improve utilization of the Gan River for more reliable freight transport and for cleaner energy production through: (a) improving inland waterway transport capacity and service levels for primary and secondary industries in the Nanchang-Ganzhou corridor of the Gan River; and (b) generating renewable electricity to help meet rapidly growing demand for energy in the region. There are three components to the project. The first component of the project is construction of Shihutang complex, which is a single integral infrastructure unit consisting of 23 sets of sluice gates, one grade third ship lock, one powerhouse of 120 MW installation capacity, and two sections of connection dam. The second component of the project is flood protection works, which consist of approximately 43km of dikes and 56km of diversion canals, about six sets of pumping stations, two sets of free drainage sluices and two sets of regulating sluices. The third and final component of the project is technical assistance (TA), which consists of two technical studies and a capacity building program which aim to build the institutional and technical capacities of the implementing agency. |
Original sector | FY17 - Energy and Extractives,FY17 - Transportation |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Fertilizers, Power Generation (CCGT), Waste Processing and Treatment, Seaport, Commercial, Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in China
- Three Gorges Dam Hydro Electric Power Plant China
- Taishan Nuclear Power Plant
- Tianwan Nuclear Power Plant Lianyungang
- Zhenan PumpedStorage Power Project
- Xiluodu Hydroelectric Power Plant
- Hynix China Project Clean Room Package
- Yichun Economic Development Zone Sewage Comprehensive Treatment Plant
- Baoying Waste-to-Energy plant