Jiangxi Wuxikou Integrated Flood Management Project
Sector: Mass Transit • Location: China
Source: World Bank Group
The development objective of the Jiangxi Wuxikou Integrated Flood Management Project for China is to reduce the flood risk in the central urban area of Jingdezhen city through implementation of priority structural and non-structural measures, and contribute to establishment of an integrated flood risk management system for the city. There are four components to the project. The first component of
- Status
- Closed
- Sector
- Mass Transit, Solar, Water Supply and Storage, Rail, Automotive, Biomass, Wind, Geothermal, Commercial, Waste Processing and Treatment, Hydro, Residential, Forest Products and Packaging, Government
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Jiangxi Wuxikou Integrated Flood Management Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of the Jiangxi Wuxikou Integrated Flood Management Project for China is to reduce the flood risk in the central urban area of Jingdezhen city through implementation of priority structural and non-structural measures, and contribute to establishment of an integrated flood risk management system for the city. There are four components to the project. The first component of the project is construction of Wuxikou flood control scheme. This component includes: acquisition and installation of electro-mechanical equipment of five radial gates, and implementation of the Environmental and Social Management Plan (ESMP). The second component of the project is capacity building for integrated flood risk management system. This component includes: preparation of a master plan of integrated flood risk management for Jingdezhen city, and provision of equipment for a municipal flood control and dispatching center, including essential operation equipment to facilitate efficient functioning of the municipal flood management system. The third component of the project is implementation of resettlement action plan. This component includes: investment in resettlement, investment in special infrastructure, and reallocation of effected section of railway. The fourth component of the project is project management and implementation support. This component includes: provision of consulting services to enhance engineering design, construction supervision, dam safety and environmental and social management, including the formation and maintenance of a dam safety panel of experts, and acquisition of office equipment and vehicles, and provision of operating resources. |
Original sector | FY17 - Energy and Extractives,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Solar, Water Supply and Storage, Rail, Automotive, Biomass, Wind, Geothermal, Commercial, Waste Processing and Treatment, Hydro, Residential, Forest Products and Packaging, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in China
- Baluntai-Yiergen Railway
- Fujian Jiangyin International Container Terminal
- Shenzhen Metro Line 4 Phases I & II
- Tung Chung Sewage Treatment Plant and supporting infrastructure upgrade
- Guye District transportation improvement project
- Underground comprehensive pipe gallery in Lanshi CBD area
- Pengzhou-Bailu Railway
- Jining City Weihe Development Road project
