logo

Jiangxi Wuxikou Integrated Flood Management Project

Sector: Mass Transit • Location: China

Source: World Bank Group

Project
Closed

The development objective of the Jiangxi Wuxikou Integrated Flood Management Project for China is to reduce the flood risk in the central urban area of Jingdezhen city through implementation of priority structural and non-structural measures, and contribute to establishment of an integrated flood risk management system for the city. There are four components to the project. The first component of

Status
Closed
Sector
Mass Transit, Solar, Water Supply and Storage, Rail, Automotive, Biomass, Wind, Geothermal, Commercial, Waste Processing and Treatment, Hydro, Residential, Forest Products and Packaging, Government
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Jiangxi Wuxikou Integrated Flood Management Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Jiangxi Wuxikou Integrated Flood Management Project” is an infrastructure initiative in the Mass Transit sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the Jiangxi Wuxikou Integrated Flood Management Project for China is to reduce the flood risk in the central urban area of Jingdezhen city through implementation of priority structural and non-structural measures, and contribute to establishment of an integrated flood risk management system for the city. There are four components to the project. The first component of the project is construction of Wuxikou flood control scheme. This component includes: acquisition and installation of electro-mechanical equipment of five radial gates, and implementation of the Environmental and Social Management Plan (ESMP). The second component of the project is capacity building for integrated flood risk management system. This component includes: preparation of a master plan of integrated flood risk management for Jingdezhen city, and provision of equipment for a municipal flood control and dispatching center, including essential operation equipment to facilitate efficient functioning of the municipal flood management system. The third component of the project is implementation of resettlement action plan. This component includes: investment in resettlement, investment in special infrastructure, and reallocation of effected section of railway. The fourth component of the project is project management and implementation support. This component includes: provision of consulting services to enhance engineering design, construction supervision, dam safety and environmental and social management, including the formation and maintenance of a dam safety panel of experts, and acquisition of office equipment and vehicles, and provision of operating resources.

Original sector

FY17 - Energy and Extractives,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Mass Transit, Solar, Water Supply and Storage, Rail, Automotive, Biomass, Wind, Geothermal, Commercial, Waste Processing and Treatment, Hydro, Residential, Forest Products and Packaging, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project