logo

Jiangxi Wuxikou Integrated Flood Management Project

Sector: Mass Transit • Location: China

Source: World Bank

Project
Closed

The development objective of the Jiangxi Wuxikou Integrated Flood Management Project for China is to reduce the flood risk in the central urban area of Jingdezhen city through implementation of priority structural and non-structural measures, and contribute to establishment of an integrated flood risk management system for the city. There are four components to the project. The first component of

Project Information FAQ

Project Information

5 Q
The project “Jiangxi Wuxikou Integrated Flood Management Project” is an infrastructure initiative in the Mass Transit sector, located in China. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objective of the Jiangxi Wuxikou Integrated Flood Management Project for China is to reduce the flood risk in the central urban area of Jingdezhen city through implementation of priority structural and non-structural measures, and contribute to establishment of an integrated flood risk management system for the city. There are four components to the project. The first component of the project is construction of Wuxikou flood control scheme. This component includes: acquisition and installation of electro-mechanical equipment of five radial gates, and implementation of the Environmental and Social Management Plan (ESMP). The second component of the project is capacity building for integrated flood risk management system. This component includes: preparation of a master plan of integrated flood risk management for Jingdezhen city, and provision of equipment for a municipal flood control and dispatching center, including essential operation equipment to facilitate efficient functioning of the municipal flood management system. The third component of the project is implementation of resettlement action plan. This component includes: investment in resettlement, investment in special infrastructure, and reallocation of effected section of railway. The fourth component of the project is project management and implementation support. This component includes: provision of consulting services to enhance engineering design, construction supervision, dam safety and environmental and social management, including the formation and maintenance of a dam safety panel of experts, and acquisition of office equipment and vehicles, and provision of operating resources.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data