Jiangxi Wuxikou Integrated Flood Management Project
Sector: Mass Transit • Location: China
Source: World Bank
The development objective of the Jiangxi Wuxikou Integrated Flood Management Project for China is to reduce the flood risk in the central urban area of Jingdezhen city through implementation of priority structural and non-structural measures, and contribute to establishment of an integrated flood risk management system for the city. There are four components to the project. The first component of
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The development objective of the Jiangxi Wuxikou Integrated Flood Management Project for China is to reduce the flood risk in the central urban area of Jingdezhen city through implementation of priority structural and non-structural measures, and contribute to establishment of an integrated flood risk management system for the city. There are four components to the project. The first component of the project is construction of Wuxikou flood control scheme. This component includes: acquisition and installation of electro-mechanical equipment of five radial gates, and implementation of the Environmental and Social Management Plan (ESMP). The second component of the project is capacity building for integrated flood risk management system. This component includes: preparation of a master plan of integrated flood risk management for Jingdezhen city, and provision of equipment for a municipal flood control and dispatching center, including essential operation equipment to facilitate efficient functioning of the municipal flood management system. The third component of the project is implementation of resettlement action plan. This component includes: investment in resettlement, investment in special infrastructure, and reallocation of effected section of railway. The fourth component of the project is project management and implementation support. This component includes: provision of consulting services to enhance engineering design, construction supervision, dam safety and environmental and social management, including the formation and maintenance of a dam safety panel of experts, and acquisition of office equipment and vehicles, and provision of operating resources. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
