logo

Jiapeng Village Service Station / Zhaoyang Architects

Sector: Cement • Location: China

Source: ArchDaily

Project
Closed

Outside of this boundary, the rise and fall of the profile of this curved boundary echoes and even arouses a sense of speed when cyclists and joggers pass by.Inside this boundary, the site is divided into three layers: a cafeteria in the middle, a plaza to the north, and a sunken courtyard to the south.Text description provided by the architects.Erhai Lake Ecological Corridor inDaliaims to establi

Project Information FAQ

Project Information

3 Q
The project “Jiapeng Village Service Station / Zhaoyang Architects” is an infrastructure initiative in the Cement sector, located in China. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Outside of this boundary, the rise and fall of the profile of this curved boundary echoes and even arouses a sense of speed when cyclists and joggers pass by.Inside this boundary, the site is divided into three layers: a cafeteria in the middle, a plaza to the north, and a sunken courtyard to the south.Text description provided by the architects.Erhai Lake Ecological Corridor inDaliaims to establish a healthy water-land buffer zone and ecological barrier, expanding the lake’s interactive interface for the residents and tourists.Along the 129-kilometer lakeside corridor, multiple service stations are planned. Zhaoyang Architects was invited to design three service stations and two of them have been realized.The Jiapeng village service station is located along the south part of the corridor, occupying a triangular-shaped site. The building responds to the curvature of the corridor with a 80-meter-long concrete wall and creates a boundary between inside and outside.At the center part of the wall, an eye-shaped opening allows visual connection from the two sides. The carefully arranged levels, stairs, and steps articulate an experience of architectural promenade.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data