logo

Jilamito Hydroelectric Plant

Sector: Hydro • Location: Honduras

Source: World Bank Group

Project
Active

The hydro plant is located in the municipality of Arizona, Honduras. It will have a total installed capacity of 14.8MW. It is expected to generate 85.84GWh per year, which will be injected into the grid through a 6.5-mile transmission line. The owner of the facility is Honduras’ Inversiones de Generación Eléctricas (Ingelsa), which in turn is controlled by manufacturing firm Hermacasa. IDB Invest

Status
Prospective
Sector
Hydro, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Honduras
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Jilamito Hydroelectric Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Jilamito Hydroelectric Plant” is an infrastructure initiative in the Hydro sector, located in Honduras. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The hydro plant is located in the municipality of Arizona, Honduras. It will have a total installed capacity of 14.8MW. It is expected to generate 85.84GWh per year, which will be injected into the grid through a 6.5-mile transmission line. The owner of the facility is Honduras’ Inversiones de Generación Eléctricas (Ingelsa), which in turn is controlled by manufacturing firm Hermacasa. IDB Invest, the private sector arm of the Inter-American Development Bank, has approved a $20.25 million loan to fund construction of a 14.8MW hydro project in Honduras. Total project cost will be USD 75.60m. Financial Close was achieved in November 2020. https://www.idbinvest.org/en/projects/ph-jilamito https://ijglobal.com/articles/151819/idb-invest-finances-honduran-hydro-unit

Original sector

Energy

Budget

Location

Country

Honduras

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project