logo

Jilin Heiyupao Jilin Power-Xiehe Wind Farm Phase III

Sector: Wind • Location: Jilin, China

Source: World Bank Group

Project
Active

The CPI and China WindPower Zhenlai Wind Farm Phase III was a 49.5MW wind farm located in Heiyupao, Baicheng, Jilin Province, China and developed by China WindPower Group and Jilin Power, a subsidiary of China Power Investment. The project was procured on an open bidding process. The concessionnaire was Jilin Power-Xiehe New Energy Co., Ltd. (established in July 2010, with a registration capital

Status
Prospective
Sector
Wind, Power Generation (CCGT), Raw Materials, Government, Commercial
Location
Jilin, China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Jilin Heiyupao Jilin Power-Xiehe Wind Farm Phase III

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Jilin Heiyupao Jilin Power-Xiehe Wind Farm Phase III” is an infrastructure initiative in the Wind sector, located in Jilin, China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The CPI and China WindPower Zhenlai Wind Farm Phase III was a 49.5MW wind farm located in Heiyupao, Baicheng, Jilin Province, China and developed by China WindPower Group and Jilin Power, a subsidiary of China Power Investment. The project was procured on an open bidding process. The concessionnaire was Jilin Power-Xiehe New Energy Co., Ltd. (established in July 2010, with a registration capital of RMB 100 million), in which China WindPower Group had a 49% stake with the remaining ownership belonging to the state owned Jilin Power Group. The total investment was estimated to be around RMB 461.90 million (US $71.50 million). From May 2011, some major calls for proposals for equipment were released by the concessionnaire. Construction commenced in Aug 2011 and the project came into operation in June 2012. At 25% of construction was achieved by Nov 2011.

Original sector

Energy

Budget

Location

Country

China

State

Jilin

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Power Generation (CCGT), Raw Materials, Government, Commercial

Article published date

2024-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project