logo

Jindal Tamnar Power Plant Phase I and II

Sector: Geothermal • Location: India

Source: World Bank Group

Project
Active

Jindal Power Limited set up India’s first mega power project in the private sector – the 1000 MW thermal power plant at Raigarh, Chhattisgarh. The Company invested approximately Rs. 43.38 billion (US$1050 million) for setting up a 1000 MW power plant. The 1st unit commenced commercial operations in December 2007 and all four units (250 MW each) were commissioned within a span of nine months. Tamna

Status
Prospective
Sector
Geothermal, Power Generation (CCGT), Power Transmission, Government, Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Jindal Tamnar Power Plant Phase I and II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Jindal Tamnar Power Plant Phase I and II” is an infrastructure initiative in the Geothermal sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Jindal Power Limited set up India’s first mega power project in the private sector – the 1000 MW thermal power plant at Raigarh, Chhattisgarh. The Company invested approximately Rs. 43.38 billion (US$1050 million) for setting up a 1000 MW power plant. The 1st unit commenced commercial operations in December 2007 and all four units (250 MW each) were commissioned within a span of nine months. Tamnar I Project commenced full commercial operations in September 2008. The fuel supply of the plant is met through its captive coal mines. A 6.9 km conveyor pipeline has been set up for transportation of coal between the mines and the plant. Electricity generated by the project is sold through bilateral power purchase arrangements and power exchanges to state-owned utilities and power distribution and trading companies. In 2010, the project company implemented Tamnar II Project: a 2,400 MW coal based power expansion in Tammar I. The 4x600 MW project had an estimated cost of INR134.10 billion (US$2932.5 million). Tamnar II reached financial closure in March 2010. Debt was split between a INR53bn 14-year term loan and a INR47bn 14-year term loan. SBI Capital Markets Ltd is the mandated arranger. 2 Units of 600MW each were commissioned in March 2014.

Original sector

Energy

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Geothermal, Power Generation (CCGT), Power Transmission, Government, Commercial

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project