logo

Jining City Weihe Development Road project

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Active

The project entails the construction of the proposed section of Jining Fuhe Comprehensive Development Road Project, located at the Weihe Bridge of Shenghua Road, Lishui, along the Weihe River Embankment via Lianshui County, Qufu City, Yinzhou District, Gaoxin District, Zoucheng City, Weishan County and Taibai Lake New District. The end point is the intersection of the river bank on both sides of t

Status
Prospective
Sector
Mass Transit, Bridge, Hotel, Rail, Road, Government, Commercial
Location
Shandong, China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Jining City Weihe Development Road project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Jining City Weihe Development Road project” is an infrastructure initiative in the Mass Transit sector, located in Shandong, China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails the construction of the proposed section of Jining Fuhe Comprehensive Development Road Project, located at the Weihe Bridge of Shenghua Road, Lishui, along the Weihe River Embankment via Lianshui County, Qufu City, Yinzhou District, Gaoxin District, Zoucheng City, Weishan County and Taibai Lake New District. The end point is the intersection of the river bank on both sides of the Weihe River and the east line of the Huanhu Avenue. The project is positioned as a special road integrating flood control, tourism transportation, landscape, regional transportation and functions of villages and towns along the service line. With reference to the secondary road standard, the local standard is not lower than the third-class highway standard, and the design speed is 40 km/h. The load rating is Highway-I, and the subgrade width is 9.25 meters and 14 meters. The total length of the left and right riverbanks between the starting and ending points of the route is 184.4Km, of which the length of the first demonstration section is 27.027Km, and the new length of the project is 157.373Km. The estimated total investment of this PPP project is about $ 276.22 million. The planned construction period is 24 months. Sponsors of the project are China Railway 16th Bureau Group Yongxing Investment (Tianjin) Co., Ltd. (70%), China Railway 16th Bureau Group Co., Ltd. (25%) and the state-owned Jining Lunan Highway Engineering Company (5%). The type of concession is BOT and the period of the contract is 15 years. Financial close took place on April 2, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=9d969ae9bd254ff1aa3f624f88bca34c

Original sector

Transport

Procurement method

Budget

Location

Country

China

State

Shandong

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Mass Transit, Bridge, Hotel, Rail, Road, Government, Commercial

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project