logo

Jining City Weihe Development Road project

Sector: Mass Transit • Location: China

Source: World Bank Group

Project
Active

The project entails the construction of the proposed section of Jining Fuhe Comprehensive Development Road Project, located at the Weihe Bridge of Shenghua Road, Lishui, along the Weihe River Embankment via Lianshui County, Qufu City, Yinzhou District, Gaoxin District, Zoucheng City, Weishan County and Taibai Lake New District. The end point is the intersection of the river bank on both sides of t

Project Information FAQ

Project Information

4 Q
The project “Jining City Weihe Development Road project” is an infrastructure initiative in the Mass Transit sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project entails the construction of the proposed section of Jining Fuhe Comprehensive Development Road Project, located at the Weihe Bridge of Shenghua Road, Lishui, along the Weihe River Embankment via Lianshui County, Qufu City, Yinzhou District, Gaoxin District, Zoucheng City, Weishan County and Taibai Lake New District. The end point is the intersection of the river bank on both sides of the Weihe River and the east line of the Huanhu Avenue. The project is positioned as a special road integrating flood control, tourism transportation, landscape, regional transportation and functions of villages and towns along the service line. With reference to the secondary road standard, the local standard is not lower than the third-class highway standard, and the design speed is 40 km/h. The load rating is Highway-I, and the subgrade width is 9.25 meters and 14 meters. The total length of the left and right riverbanks between the starting and ending points of the route is 184.4Km, of which the length of the first demonstration section is 27.027Km, and the new length of the project is 157.373Km. The estimated total investment of this PPP project is about $ 276.22 million. The planned construction period is 24 months. Sponsors of the project are China Railway 16th Bureau Group Yongxing Investment (Tianjin) Co., Ltd. (70%), China Railway 16th Bureau Group Co., Ltd. (25%) and the state-owned Jining Lunan Highway Engineering Company (5%). The type of concession is BOT and the period of the contract is 15 years. Financial close took place on April 2, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=9d969ae9bd254ff1aa3f624f88bca34c

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data