Jirau Power Plant

Sector: Hydro • Location: Brazil

Source: World Bank Group

Project
Active

In May 2008, Consorcio Energia Sustentavel do Brasil, which was formed by Suez Energy (50.1%), Eletrosul (20%), the state-owned company Chesf (20%) and Camargo Correa (9.9%), was awarded in a competitive bidding process the 35-year contract to build and operate a 3.3 GW hydro power plant located in the Madeira River, state of Amazonas. Besides Energia Sustentavel do Brasil, only one other consort

Project Information FAQ

Project Information

5 Q
The project “Jirau Power Plant” is an infrastructure initiative in the Hydro sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In May 2008, Consorcio Energia Sustentavel do Brasil, which was formed by Suez Energy (50.1%), Eletrosul (20%), the state-owned company Chesf (20%) and Camargo Correa (9.9%), was awarded in a competitive bidding process the 35-year contract to build and operate a 3.3 GW hydro power plant located in the Madeira River, state of Amazonas. Besides Energia Sustentavel do Brasil, only one other consortium of companies, led by state-owned Furnas and Odebrecht, took part in the bidding contest. The bidding criteria set by the federal regulatory agency ANEEL was the lowest tariff. Energia Sustentavel do Brasil presented the lowest offer, a value of US$ 39/MWh (BRL 71.40/MWh), 21.6% below the ceiling set by the regulatory agency. The contract was signed in August 2008, and sponsors created the company Energia Sustentavel do Brasil to lead the project during the 35-year contract period. Energia Sustentavel do Brasil committed to sell 70% of the output to the regulated market and the remaining 30% to the unregulated market. Environmental regulator, Ibama, awarded an installation license to the concessionaire on 14 Nov 2008. Camargo Correa was set to conduct EPC works for the project. Alstom, Siemens, Vatech and Dongfang were contracted to supply equipment. The sponsors have signed 30-year power purchase agreements with a pool of power distribution companies. The sponsor committed to invest US$ 5.3 billion (BRL 10.5 billion) in the power plant. Financial closure was achieved in February 2009, when the sponsor was granted a US$ 3.6 billion (BRL 7.2 billion) loan from BNDES. About half of the loan granted by BNDES was comprised by the bank’s own funds, while the rest was syndicated from other financial institutions (Banco do Brasil, Caixa Economica Federal, Bradesco BBI, Unibanco e Banco do Nordeste do Brasil). The remaining cost was set to be financed with the sponsors’ internal resources. Construction works commenced in December 2009 and operations were expected to commence by 2012. As of July 2010, 22% of the works had been concluded. In September 2012, BNDES approved an additional financing package to the project amounting to US$ 1.2 billion (BRL 2.32 billion). Commercial operations commenced in September 2013.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data