Jirau Power Plant

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

In May 2008, Consorcio Energia Sustentavel do Brasil, which was formed by Suez Energy (50.1%), Eletrosul (20%), the state-owned company Chesf (20%) and Camargo Correa (9.9%), was awarded in a competitive bidding process the 35-year contract to build and operate a 3.3 GW hydro power plant located in the Madeira River, state of Amazonas. Besides Energia Sustentavel do Brasil, only one other consort

Status
Prospective
Sector
Commercial, Hydro, Power Generation (CCGT), Manufacturing (Industrial), Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Jirau Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Jirau Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In May 2008, Consorcio Energia Sustentavel do Brasil, which was formed by Suez Energy (50.1%), Eletrosul (20%), the state-owned company Chesf (20%) and Camargo Correa (9.9%), was awarded in a competitive bidding process the 35-year contract to build and operate a 3.3 GW hydro power plant located in the Madeira River, state of Amazonas. Besides Energia Sustentavel do Brasil, only one other consortium of companies, led by state-owned Furnas and Odebrecht, took part in the bidding contest. The bidding criteria set by the federal regulatory agency ANEEL was the lowest tariff. Energia Sustentavel do Brasil presented the lowest offer, a value of US$ 39/MWh (BRL 71.40/MWh), 21.6% below the ceiling set by the regulatory agency. The contract was signed in August 2008, and sponsors created the company Energia Sustentavel do Brasil to lead the project during the 35-year contract period. Energia Sustentavel do Brasil committed to sell 70% of the output to the regulated market and the remaining 30% to the unregulated market. Environmental regulator, Ibama, awarded an installation license to the concessionaire on 14 Nov 2008. Camargo Correa was set to conduct EPC works for the project. Alstom, Siemens, Vatech and Dongfang were contracted to supply equipment. The sponsors have signed 30-year power purchase agreements with a pool of power distribution companies. The sponsor committed to invest US$ 5.3 billion (BRL 10.5 billion) in the power plant. Financial closure was achieved in February 2009, when the sponsor was granted a US$ 3.6 billion (BRL 7.2 billion) loan from BNDES. About half of the loan granted by BNDES was comprised by the bank’s own funds, while the rest was syndicated from other financial institutions (Banco do Brasil, Caixa Economica Federal, Bradesco BBI, Unibanco e Banco do Nordeste do Brasil). The remaining cost was set to be financed with the sponsors’ internal resources. Construction works commenced in December 2009 and operations were expected to commence by 2012. As of July 2010, 22% of the works had been concluded. In September 2012, BNDES approved an additional financing package to the project amounting to US$ 1.2 billion (BRL 2.32 billion). Commercial operations commenced in September 2013.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Hydro, Power Generation (CCGT), Manufacturing (Industrial), Government

Article published date

2024-05-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project