logo
ProjectClosed

JO - Amman East Power Plant

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The project's main objective is to meet the electricity needs of the country in an economically and environmentally sustainable manner to contribute to economic growth and well-being of the population of Jordan. The project would add about 370 MW of additional power to the system, help to ensure the reliability of power supply and help maintain a margin between available capacity and demand of at

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Natural Gas, Commercial, Government
Location
Jordan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about JO - Amman East Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “JO - Amman East Power Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in Jordan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project's main objective is to meet the electricity needs of the country in an economically and environmentally sustainable manner to contribute to economic growth and well-being of the population of Jordan. The project would add about 370 MW of additional power to the system, help to ensure the reliability of power supply and help maintain a margin between available capacity and demand of at least 10 percent. The purpose of the IBRD Guarantee is to enhance competition and therefore help reduce the project's financing costs. The project components consist of a 370-MW gas-fired combined-cycle power station to be developed, owned, and operated by a private-sector project company. The power station will be constructed on a site located at Almanakher, east of Amman Jordan and about 1 km from the Arab Gas Pipeline. The fuel supply will be natural gas from Egypt; distillate fuel oil (DFO) will serve as backup fuel for emergency operations only. The first phase of the power station will comprise two simple-cycle gas turbines. The second phase will add a heat recovery steam generator (HSRG) and thus increase the capacity by 50 percent. The water for steam generation will be provided by the Water Authority of Jordan. The contractual structure of the transaction is consistent with industry standards with respect to the allocation of commercial, technical, and political risks among the parties in a limited-recourse project financing structure.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Jordan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Natural Gas, Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project