logo

JO - Amman East Power Plant

Sector: Water Supply and Storage • Location: Jordan

Source: World Bank Group

Project
Closed

The project's main objective is to meet the electricity needs of the country in an economically and environmentally sustainable manner to contribute to economic growth and well-being of the population of Jordan. The project would add about 370 MW of additional power to the system, help to ensure the reliability of power supply and help maintain a margin between available capacity and demand of at

Project Information FAQ

Project Information

5 Q
The project “JO - Amman East Power Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in Jordan. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project's main objective is to meet the electricity needs of the country in an economically and environmentally sustainable manner to contribute to economic growth and well-being of the population of Jordan. The project would add about 370 MW of additional power to the system, help to ensure the reliability of power supply and help maintain a margin between available capacity and demand of at least 10 percent. The purpose of the IBRD Guarantee is to enhance competition and therefore help reduce the project's financing costs. The project components consist of a 370-MW gas-fired combined-cycle power station to be developed, owned, and operated by a private-sector project company. The power station will be constructed on a site located at Almanakher, east of Amman Jordan and about 1 km from the Arab Gas Pipeline. The fuel supply will be natural gas from Egypt; distillate fuel oil (DFO) will serve as backup fuel for emergency operations only. The first phase of the power station will comprise two simple-cycle gas turbines. The second phase will add a heat recovery steam generator (HSRG) and thus increase the capacity by 50 percent. The water for steam generation will be provided by the Water Authority of Jordan. The contractual structure of the transaction is consistent with industry standards with respect to the allocation of commercial, technical, and political risks among the parties in a limited-recourse project financing structure.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data