logo
ProjectDesign Development

Joe Carrillo Blvd/Countryside Blvd Shared Use Path (SUP)

Design development · Texas · Last reported Sep 2025

Source: Dodge

34,560 Sq. ft - Construct 0.78 miles (34,560 SF) of proposed 10' wide shared-use path (SUP) improvements and accessible cross-walks on Joe Carrillo St and Country Side Blvd

Status
Prospective
Sector
Commercial, Manufacturing (Industrial), Government
Location
Seguin, Texas, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Joe Carrillo Blvd/Countryside Blvd Shared Use Path (SUP)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Joe Carrillo Blvd/Countryside Blvd Shared Use Path (SUP)” is an infrastructure initiative in the Commercial sector, located in Seguin, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

design development

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

34,560 Sq. ft - Construct 0.78 miles (34,560 SF) of proposed 10' wide shared-use path (SUP) improvements and accessible cross-walks on Joe Carrillo St and Country Side Blvd

Budget

Location

Country

United States of America (USA)

State

Texas

City

Seguin

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Commercial, Manufacturing (Industrial), Government

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project