Joe Pool Lake Dredging
Sector: Water Supply and Storage • Location: Midlothian, Texas, United States of America
Source: Dodge USA
Joe Pool Lake Dredging includes dredging the bowl at the base of the City of Midlothian s existing intake tower at the Joe Pool Lake Raw Water Pump Station. The volume of the material to be extracted is approximately 20,000 cubic yards. The dredged material is to be pumped to geotextile dewatering tubes to be stages at the City s Tayman Water Treatment Plant.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Manufacturing (Industrial), Commercial
- Location
- Midlothian, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Joe Pool Lake Dredging
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Joe Pool Lake Dredging includes dredging the bowl at the base of the City of Midlothian s existing intake tower at the Joe Pool Lake Raw Water Pump Station. The volume of the material to be extracted is approximately 20,000 cubic yards. The dredged material is to be pumped to geotextile dewatering tubes to be stages at the City s Tayman Water Treatment Plant. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Midlothian |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
