Joe Rich Area Sideroads Resurfacing
Start · British Columbia · Last reported Sep 2020
Source: Dodge USA
Surfacing 47.2 lane kilometres to include quality and traffic management, survey layout, aggregate production, asphalt mix design, remove and replace CRB, cold milling, supply and apply emulsified tack coat, supply and spray joint adhesive, level course, top lift and medium mix supply and apply joint sealant shouldering, site cleanup and restoration.
- Status
- Prospective
- Sector
- Road, Commercial, Manufacturing (Industrial)
- Location
- Kelowna, British Columbia, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Joe Rich Area Sideroads Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Surfacing 47.2 lane kilometres to include quality and traffic management, survey layout, aggregate production, asphalt mix design, remove and replace CRB, cold milling, supply and apply emulsified tack coat, supply and spray joint adhesive, level course, top lift and medium mix supply and apply joint sealant shouldering, site cleanup and restoration. |
Procurement method |
Location
Country | Canada |
State | British Columbia |
City | Kelowna |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Manufacturing (Industrial) |
Article published date | 2024-02-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
