John C Fremont Park Amphitheater & Auxiliary Building
Sector: Stadium • Location: Fremont, Nebraska, United States of America
Source: Dodge
The proposed JCF Park Amphitheater & Auxiliary Building will be located at 8th and Broad Streets in Fremont, NE and will consist of two separate buildings. a. The Amphitheater will consist of a 2,892 square foot masonry building that will be sub-divided into a stage area, back stage area, changing rooms, restrooms, and a mechanical room. The building will utilize interior metal stud framing and in
- Status
- Closed
- Sector
- Stadium, Power Transmission, Road, Manufacturing (Industrial), Commercial, Car parking, Automotive, Cement, Power Generation (CCGT), Metal, Government
- Location
- Fremont, Nebraska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about John C Fremont Park Amphitheater & Auxiliary Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed JCF Park Amphitheater & Auxiliary Building will be located at 8th and Broad Streets in Fremont, NE and will consist of two separate buildings. a. The Amphitheater will consist of a 2,892 square foot masonry building that will be sub-divided into a stage area, back stage area, changing rooms, restrooms, and a mechanical room. The building will utilize interior metal stud framing and interior concrete block walls to sub-divide the spaces. The exterior facade will consist of a brick... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Fremont |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Stadium, Power Transmission, Road, Manufacturing (Industrial), Commercial, Car parking, Automotive, Cement, Power Generation (CCGT), Metal, Government |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
