John C. Waldron Memorial Bridge Plaza Construction
Sector: Bridge • Location: Pierre, South Dakota, USA
Source: KCCR-AM
Construction work on the plaza at the Pierre side of the new John C. Waldron Memorial Bridge is underway, causing a temporary pedestrian detour under the bridge. The detour starts near the Amphitheater, with Steamboat Park remaining open. The pedestrian detour is expected to last approximately six weeks, reopening in late August or early September.
- Status
- Under Construction
- Sector
- Bridge, Government
- Location
- Pierre, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- KCCR-AM
ConstructChat
Ask ConstructChat about John C. Waldron Memorial Bridge Plaza Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction work on the plaza at the Pierre side of the new John C. Waldron Memorial Bridge is underway, causing a temporary pedestrian detour under the bridge. The detour starts near the Amphitheater, with Steamboat Park remaining open. The pedestrian detour is expected to last approximately six weeks, reopening in late August or early September. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Pierre |
Source
Source | KCCR-AM |
URL |
More Details
Record type | Project |
Sector | Bridge, Government |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in USA
- Widen Turnpike Mainline SR 91 from WPB Service Plaza to Okeechobee Blvd SR 704
- Widen Turnpike from Glades Rd to Atlantic Ave
- Add Auxiliary Lanes Turnpike TSMO from SR 821 to Griffin Road SR 818
- Widen Turnpike from Southern Blvd to Okeechobee Blvd
- Widen Turnpike from West Palm Beach Service Plaza to Southern Blvd
- Widen Turnpike Mainline from Neptune Road to Osceola Parkway
- Sand Lake Interchange
- Polk ParkwaySR 570 Bridge Painting Project in Polk County
