John Day Dam Turbine Runner Replacement
Sector: Wind • Location: Rufus, Oregon, United States of America
Source: Dodge USA
turbine runner replacement and generator rehabilitation of up to sixteen turbines and generators and John Day Dam, spanning the Columbia River between Washington and Oregon. The goals of the project are to address decreasing reliability and efficiency of the hydroelectric generating units and to maximize the net economic benefits over the next several decades, while maintaining an acceptable level
- Status
- Closed
- Sector
- Wind, Hydro, Power Generation (CCGT), Commercial, Water Supply and Storage
- Location
- Rufus, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about John Day Dam Turbine Runner Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | turbine runner replacement and generator rehabilitation of up to sixteen turbines and generators and John Day Dam, spanning the Columbia River between Washington and Oregon. The goals of the project are to address decreasing reliability and efficiency of the hydroelectric generating units and to maximize the net economic benefits over the next several decades, while maintaining an acceptable level of operational flexibility, all within the hydraulic and environmental constraints imposed on th... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Rufus |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Wind, Hydro, Power Generation (CCGT), Commercial, Water Supply and Storage |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States of America
- NTIA Tribal Broadband Connectivity Program
- Pump Station 3 Replacement
- Reston Town Center Expansion
- 108th Avenue Northeast transit queue jump
- 4520 Barrett Road Tentative Parcel Map and Abandonment
- Abandonment Of Portions Of An I.O.D. And P.U.E. Located Within 4110 Winding Bluff Lane
- Whisper Wind Temporary Hardship Mobile Home
- 4450 Manzanita Ave (Winding Ranch) Pre Application Meeting
