John Garthe Reservoir PFAS Treatment
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge
r: The City of Santa Ana PFAS Treatment System at John Garthe Reservoir project includes construction of a twelve ion exchange pressure vessels, three pre-treatment cartridge filter vessels, and on-site sodium hypochlorite generation system with chemical storage for the removal of PFAS and disinfection of raw water produced from City Wells 18, 32, 36 and 39. The project includes sand separator ins
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Commercial, Consumer Products, Government
- Location
- Santa Ana, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about John Garthe Reservoir PFAS Treatment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | r: The City of Santa Ana PFAS Treatment System at John Garthe Reservoir project includes construction of a twelve ion exchange pressure vessels, three pre-treatment cartridge filter vessels, and on-site sodium hypochlorite generation system with chemical storage for the removal of PFAS and disinfection of raw water produced from City Wells 18, 32, 36 and 39. The project includes sand separator installation for Well32; well pump and motor upgrades and piping replacements for Wells 18, 36 and 3... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Santa Ana |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Commercial, Consumer Products, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
