John Glenn HS - Visitor Bleacher Replacement
Sector: Water Supply and Storage • Location: Bay City, Michigan, United States of America
Source: Dodge
- Prepare site access drive and remove perimeter fence as needed to accomplish work scope as noted on the plans. Site to remain secured at all times. Temporary fence may be required. 2. Demolish the existing visitors bleachers, foundations, etc. and remove. 3. Fence and gate modifications as indicated. 4. Add drainage as indicated. 5. Reconstruct concrete slab as indicated. 6. Regrading and resto
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | 1. Prepare site access drive and remove perimeter fence as needed to accomplish work scope as noted on the plans. Site to remain secured at all times. Temporary fence may be required. 2. Demolish the existing visitors bleachers, foundations, etc. and remove. 3. Fence and gate modifications as indicated. 4. Add drainage as indicated. 5. Reconstruct concrete slab as indicated. 6. Regrading and restoration as indicated. 7. Reinstall perimeter fence and restoration of site access drive. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
