logo
ProjectClosed

John Orr Tower Electrical Service Upgrades

Sector: Power Generation (CCGT) • Location: Kingston, Ontario, Canada

Source: Dodge

A summary of the project scope contained within the Issued for Tender Package is as follows:Replacement of the existing 5kV load break switchReplacement of the 450kVA transformerReplacement of the main 208/120 volt normal-power switchboardReplacement of the main 208/120 volt emergency-power panel boardReplacement of the emergency generatorReplacement of the bus duct that rises up through the entir

Status
Closed
Sector
Power Generation (CCGT), Power Transmission, Commercial
Location
Kingston, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about John Orr Tower Electrical Service Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “John Orr Tower Electrical Service Upgrades” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Kingston, Ontario, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A summary of the project scope contained within the Issued for Tender Package is as follows:Replacement of the existing 5kV load break switchReplacement of the 450kVA transformerReplacement of the main 208/120 volt normal-power switchboardReplacement of the main 208/120 volt emergency-power panel boardReplacement of the emergency generatorReplacement of the bus duct that rises up through the entire buildingJOT is part of Queen's Community Housing and has full-time tenants year-round. lengthy ...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Kingston

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Commercial

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project