Johnson Nursing Program Expansion Phase 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Construction of a perimeter wall for future Nursing Space Expansion at the second floor of the Willey Library. Work on the Johnson Campus also includes membrane roof replacement, replacement of the existing glazing at skylights, paint existing steel sunscreen, replace damaged snowguards and repair of masonry control joints and weeps.
- Status
- Closed
- Sector
- Education, Hospital, Cement, Steel, Hotel, Commercial, Metal
- Location
- Johnson, Vermont, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Johnson Nursing Program Expansion Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a perimeter wall for future Nursing Space Expansion at the second floor of the Willey Library. Work on the Johnson Campus also includes membrane roof replacement, replacement of the existing glazing at skylights, paint existing steel sunscreen, replace damaged snowguards and repair of masonry control joints and weeps. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Vermont |
City | Johnson |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Education, Hospital, Cement, Steel, Hotel, Commercial, Metal |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
