logo

Joint financing project "Development of rural areas with integrated water resources management (IWRM)"

Sector: Water Supply and Storage • Location: Tunisia

Source: KFW Bank aus Verantwortung

Project
Active

The aim of the IWRM programme is to create the conditions for sustainable, interregional and integrated management of water resources in the programme region by providing infrastructure for storage, more efficient use and fairer distribution of scarce (surface) water resources as well as measures to reduce water losses. In the medium term, this should lead to improved water availability, especiall

Project Information FAQ

Project Information

5 Q
The project “Joint financing project "Development of rural areas with integrated water resources management (IWRM)"” is an infrastructure initiative in the Water Supply and Storage sector, located in Tunisia. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The aim of the IWRM programme is to create the conditions for sustainable, interregional and integrated management of water resources in the programme region by providing infrastructure for storage, more efficient use and fairer distribution of scarce (surface) water resources as well as measures to reduce water losses. In the medium term, this should lead to improved water availability, especially in disadvantaged rural areas, and make a contribution to socio-economic development there. At the same time, increased surface water use relieves the pressure on groundwater resources (resource protection). The programme components already tested will add value to at least 127 million m³ of storage volume (rehabilitated) and/or create new ones, and at least 260 km of water transfer and distribution networks will be added to value and/or created new ones. In addition, the necessary infrastructure will be built to treat up to 9.5 million m³ of surface water per year to drinking water quality. These measures will improve (directly and indirectly) the living conditions of up to 4.5 million people (almost 50% of the Tunisian population).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data