logo

Joint Intercepting Sewer Rehabilitation Phase 1

Sector: Water Supply and Storage • Location: Palo Alto, California, United States of America

Source: Dodge USA

Project
Closed

Description of Project: Rehabilitate 2,306 linear feet of 72-inch diameter joint intercepting sewer (sewer interceptor) reinforced concrete pipe between MH-04 and JB-1 as well as another 89 linear feet of sewer interceptor between JB-1 and JB-0. The scope of work includes, but is not limited to, the following: rehabilitation of MH-03 and MH-02; bypass pumping around the intercepting sewer; pipelin

Status
Closed
Sector
Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial
Location
Palo Alto, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Joint Intercepting Sewer Rehabilitation Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Joint Intercepting Sewer Rehabilitation Phase 1” is an infrastructure initiative in the Water Supply and Storage sector, located in Palo Alto, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Description of Project: Rehabilitate 2,306 linear feet of 72-inch diameter joint intercepting sewer (sewer interceptor) reinforced concrete pipe between MH-04 and JB-1 as well as another 89 linear feet of sewer interceptor between JB-1 and JB-0. The scope of work includes, but is not limited to, the following: rehabilitation of MH-03 and MH-02; bypass pumping around the intercepting sewer; pipeline cleaning and rehabilitation; disposal of waste; manhole and lateral reinstatement; bypass syste...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Palo Alto

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project