Joint Outfall G Unit 9 Trunk Sewer Rehabilitation Phase V
Sector: Water Supply and Storage • Location: Cudahy, California, United States of America
Source: Dodge
The project will rehabilitate approximately 5,666 feet of 27-, 30-, and 33-inch diameter clay tile lined reinforced concrete pipe (RCP-CTL) sewer on the Joint Outfall G Unit 9 Trunk Sewer by sliplining with a fiberglass reinforced liner pipe. The project will also rehabilitate approximately 202 feet of 18-inch diameter non-reinforced concrete pipe on the Wilcox Avenue Trunk Sewer and 365 feet of 2
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government, Waste Processing and Treatment, Cement, Commercial
- Location
- Cudahy, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Joint Outfall G Unit 9 Trunk Sewer Rehabilitation Phase V
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will rehabilitate approximately 5,666 feet of 27-, 30-, and 33-inch diameter clay tile lined reinforced concrete pipe (RCP-CTL) sewer on the Joint Outfall G Unit 9 Trunk Sewer by sliplining with a fiberglass reinforced liner pipe. The project will also rehabilitate approximately 202 feet of 18-inch diameter non-reinforced concrete pipe on the Wilcox Avenue Trunk Sewer and 365 feet of 27-inch diameter RCP-CTL on the Wright Road Trunk Sewer with cured-in-place-pipe (CIPP) liners and... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Cudahy |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Waste Processing and Treatment, Cement, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
