Jojobera Coal Fired Plant

Sector: Geothermal • Location: India

Source: World Bank Group

The Jamshedpur Power Company, a joint venture between Mission Energy and the Tata Power Companies (TPC), developed an estimated 240-MW (120-MW x 2) coal-fired power plant at Jojobera, Bihar State. TPC is comprised of 3 private utilities--Tata Power Company, Tata Hydro Power Supply Company, and Andhra Valley Power Supply Company. The estimated project cost was Rs 981 crores, approximately $282.3 mi

Status
Prospective
Sector
Geothermal, Steel, Hydro, Metal, Commercial, Power Transmission, Government, Manufacturing (Industrial), Power Generation (CCGT)
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Jojobera Coal Fired Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Jojobera Coal Fired Plant” is an infrastructure initiative in the Geothermal sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Jamshedpur Power Company, a joint venture between Mission Energy and the Tata Power Companies (TPC), developed an estimated 240-MW (120-MW x 2) coal-fired power plant at Jojobera, Bihar State. TPC is comprised of 3 private utilities--Tata Power Company, Tata Hydro Power Supply Company, and Andhra Valley Power Supply Company. The estimated project cost was Rs 981 crores, approximately $282.3 million. Roughly $48.9 million had been sourced by Indian Financial Institutions by 1995. Located in Jamshedpur, the automated Jojobera Power Plant distributes the bulk of its 300-megawatt power to nearby industrial customers such as Tata Steel, and occasionally sells excess electricity to other power distributors. To maximize the benefits of the 2003 expansion, Tata Power installed a network of 45 ION intelligent energy meters at all key generation and distribution points. The first 120 mw unit of the Jojobera Thermal Station started commercial operation in February 2001 and the construction of the second 120 mw unit was commissioned in December 2001. Construction work at TPC's third 120 MW Jojobera expansion plant began in 2003 with an additional investment of approximately 370-cr (US$79m) to be funded internally and through debt. The power from this additional plant was expected to be commissioned by October 2005.

Original sector

Energy

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Geothermal, Steel, Hydro, Metal, Commercial, Power Transmission, Government, Manufacturing (Industrial), Power Generation (CCGT)

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project