Jojobera Coal Fired Plant

Sector: Geothermal • Location: India

Source: World Bank Group

Project
Active

The Jamshedpur Power Company, a joint venture between Mission Energy and the Tata Power Companies (TPC), developed an estimated 240-MW (120-MW x 2) coal-fired power plant at Jojobera, Bihar State. TPC is comprised of 3 private utilities--Tata Power Company, Tata Hydro Power Supply Company, and Andhra Valley Power Supply Company. The estimated project cost was Rs 981 crores, approximately $282.3 mi

Project Information FAQ

Project Information

4 Q
The project “Jojobera Coal Fired Plant” is an infrastructure initiative in the Geothermal sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Jamshedpur Power Company, a joint venture between Mission Energy and the Tata Power Companies (TPC), developed an estimated 240-MW (120-MW x 2) coal-fired power plant at Jojobera, Bihar State. TPC is comprised of 3 private utilities--Tata Power Company, Tata Hydro Power Supply Company, and Andhra Valley Power Supply Company. The estimated project cost was Rs 981 crores, approximately $282.3 million. Roughly $48.9 million had been sourced by Indian Financial Institutions by 1995. Located in Jamshedpur, the automated Jojobera Power Plant distributes the bulk of its 300-megawatt power to nearby industrial customers such as Tata Steel, and occasionally sells excess electricity to other power distributors. To maximize the benefits of the 2003 expansion, Tata Power installed a network of 45 ION intelligent energy meters at all key generation and distribution points. The first 120 mw unit of the Jojobera Thermal Station started commercial operation in February 2001 and the construction of the second 120 mw unit was commissioned in December 2001. Construction work at TPC's third 120 MW Jojobera expansion plant began in 2003 with an additional investment of approximately 370-cr (US$79m) to be funded internally and through debt. The power from this additional plant was expected to be commissioned by October 2005.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data