Joladarasi Reservoir Construction Project
Sector: Water Supply and Storage • Location: Nandyal, Andhra Pradesh, India
Source: India Investment Grid (IIG)
Information Water Resources Department, Govt. of A.P has come up with Joladarasi Reservoir Construction Project with a ticket size of 312.3 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The aim of the proposed project is : In order
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information Water Resources Department, Govt. of A.P has come up with Joladarasi Reservoir Construction Project with a ticket size of 312.3 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The aim of the proposed project is : In order to utilize the flood waters of Kundu river during flood season, it is proposed to impound the flood waters of about 3.80 TMC at Rajoli anicut so as to supplement the KC Canal ayacut. But the existing capacity of the Rajoli anicut is of 0.20 TMC. As such, it was proposed to construct a Spillway with gates at the present anicut location to impound about 3.00 TMC. The remaining water of 0.80 TMC in Kundu river is proposed to be stored by constructing a new Reservoir across Kundu river at Joladarasi village of Koilkuntla mandal of Nandyal district. NECESSITY: During heavy flood flows in the year 2009, the flood waters spread over on both the flanks and caused inundation of adjoining lands of the villages. In consideration of bare necessity it is proposed to construct new Reservoir at Joladarasi Village. JUSTIFICATION FOR TAKING UP THE SCHEME: Flood mitigation. To overcome Inundation of Surrounding Villages. Stabilizing KC canal ayacut. Longitude 78 Degrees 20 Minutes 1 Second East Latitude 15 Degrees 14 Minutes North Salient Features of the Project : Capacity of the Reservoir :0.8 TMC Nearby village :Joladarasi of Koilkuntla M Full Reservoir Level +187.500 M Top of Bund Level +192.400 M Maximum ht. of bund :12.00 M Minimum Draw Down Level +180.000 M River sluice 1 No of 11 m x 1m Earthen Bund L/s 6.80 Kms Earthen Bund R/s 2.80 Kms Spillway : Maximum Flood Discharge 4842.70 Cumecs Crest Level +182.000 M Top of Road level +194.800 M Deepest Foundation level +177.000 M Max. Tail water level +185.735 M No & Size of Vents 15 Nos , each of 13 m x 5.50 m Type of gate Radial |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
