Jolie Bois Bridge at Mare Tabac
Sector: Automotive • Location: Mauritius
Source: Road Development Authority (RDA), Mauritius (Projects)
The aim of the project consists of the construction of a new bridge and realignment of the existing road which would improve the road safety aspects for both pedestrians and to fluidify the traffic flow. The project will consist of the reconstruction of the Joli Bois Bridge and the realignment of approximately 400 m of the road in the vicinity of the existing bridge. Additionally, it will also inv
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The aim of the project consists of the construction of a new bridge and realignment of the existing road which would improve the road safety aspects for both pedestrians and to fluidify the traffic flow. The project will consist of the reconstruction of the Joli Bois Bridge and the realignment of approximately 400 m of the road in the vicinity of the existing bridge. Additionally, it will also involve the construction of culverts and drainage structures and the widening of the road where required. The existing bridge is a stone structure with its deck being supported by 1 beam and consists of major defects. The beam is in advanced corrosion, showing signs of weakening and sagging. The road alignment along the bridge consists of two successive sharp bends. Therefore, both the existing bridge and the road geometry represents a potential hazard for vehicles as well as for the pedestrians.Click here to view the Project Brief |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
