Jonava Renewable Energy Project
The owner, status and timeline of this project. A free account opens every field.
Source: reNews.Biz
The Jonava project is a hybrid renewable energy scheme in Lithuania combining around 140MW of onshore wind, 330MWp of solar PV, and 320MWh of energy storage. The project has been developed from early-stage through permitting and design to a ready-to-build asset aligned with investor requirements. Construction is expected to commence shortly with full commercial operation targeted for 2027.
- Status
- Prospective
- Sector
- Solar, Wind, Energy Storage, Commercial
- Location
- Jonava, Lithuania
- Updated
- 22 Jul 2026
- Source
- reNews.Biz
ConstructChat
Ask ConstructChat about Jonava Renewable Energy Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Jonava project is a hybrid renewable energy scheme in Lithuania combining around 140MW of onshore wind, 330MWp of solar PV, and 320MWh of energy storage. The project has been developed from early-stage through permitting and design to a ready-to-build asset aligned with investor requirements. Construction is expected to commence shortly with full commercial operation targeted for 2027. |
Original sector | Renewable Energy |
Location
Country | Lithuania |
City | Jonava |
Source
Source | reNews.Biz |
URL |
More Details
Record type | Project |
Sector | Solar, Wind, Energy Storage, Commercial |
Article published date | 2026-04-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
