Jordan Elbridge Joint Water System Improvements
Sector: Water Supply and Storage • Location: Elbridge, New York, United States of America
Source: Dodge USA
Contract 1: Construction of 25,000 linear feet of water main and appurtenances, including pressure testing, disinfection, and site restoration. Demolition of the existing Crossett Road Pump Station, Upper Reservoir, Hamilton Road Pump Station, and Lower Reservoir. Construction of the Kingston Road Pump Station, the Crossett Road Pump Station, Hamilton Road Pump Station, and Jordan Road Chemical Bo
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Chemical (Industrial), Commercial, Manufacturing (Industrial), Power Generation (CCGT), Waste Processing and Treatment, Government
- Location
- Elbridge, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Jordan Elbridge Joint Water System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Contract 1: Construction of 25,000 linear feet of water main and appurtenances, including pressure testing, disinfection, and site restoration. Demolition of the existing Crossett Road Pump Station, Upper Reservoir, Hamilton Road Pump Station, and Lower Reservoir. Construction of the Kingston Road Pump Station, the Crossett Road Pump Station, Hamilton Road Pump Station, and Jordan Road Chemical Booster Station, including installation of pumps, piping, valving, and electrical work. Contract 2:... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Elbridge |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Chemical (Industrial), Commercial, Manufacturing (Industrial), Power Generation (CCGT), Waste Processing and Treatment, Government |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
