Jordan IPP 7
The status, timeline and source of this project. A free account opens every field.
Source: IFC Project Disclosures
The proposed IFC investment comprises an IFC A-loan of up to US$200 million supplemented by mobilized financing and hedging arrangements. This financing will support the development of a greenfield Combined Cycle Gas Turbine (CCGT) power plant located in the Mafraq district of Jordan, approximately 50 km southwest of Irbid city center, with an installed net capacity of about 700 MW (the Project),
- Status
- Prospective
- Sector
- Water Supply and Storage, Geothermal, Power Generation (CCGT), Wind, Natural Gas
- Location
- Jordan
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about Jordan IPP 7
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pending |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The proposed IFC investment comprises an IFC A-loan of up to US$200 million supplemented by mobilized financing and hedging arrangements. This financing will support the development of a greenfield Combined Cycle Gas Turbine (CCGT) power plant located in the Mafraq district of Jordan, approximately 50 km southwest of Irbid city center, with an installed net capacity of about 700 MW (the Project), and an estimated total project cost of about US$900 million. The project will be implemented through a special-purpose vehicle called “Sharikat Ak Khanasri Lil Taqa PSC” (the "Company") responsible for the design, construction, operation, and maintenance of the plant. The company has secured a 25-year Power Purchase Agreement (PPA) with the National Electric Power Company (NEPCO). The project is being developed by Etihad Development company (EDC or the "Sponsor"), a wholly owned subsidiary of UAE Etihad Water & Electricity ("EtihadWE"). EDC will be the main shareholder and controlling sponsor in the Project Company, alongside other partners still being selected by EDC.Construction activities are expected to commence by end of 2026 and last for approximately 2 years. The main project facilities will include: three gas turbines (GTs); three heat recovery steam generators (HRSGs); one steam turbine generator; and one air-cooled condenser (ACC). Auxiliary components will include feedwater system; closed cooling water system; fogging & high fogging systems; water treatment plant; wastewater handling facilities; natural gas system; backup fuel system; and black start diesel generator.The Associated Facilities of the project include: (i) ~7 km transmission line (400 kV) and substation connecting the plant to the national grid; (ii) ~300 m natural gas pipeline connecting the plant to the existing gas network; and (iii) ~4.5 km water supply pipeline from the existing water system to the plant. |
Original sector | V-AB - Gas - Thermal Power Generation |
Location
Country | Jordan |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Geothermal, Power Generation (CCGT), Wind, Natural Gas |
Article published date | 2026-09-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
