Jose Rizal Bridge (North Segment)
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Full lead abatement of the Jose Rizal Bridge including full removal of existing paint on steel members within full containment and full repaint of steel members. For the northern, SDOT-owned portion of the bridge, the superstructure, piers, strain poles, and railings are included in the scope of work. For the southern, WSDOT-owned portion of the bridge, only the strain poles and railings are inclu
- Status
- Prospective
- Sector
- Steel, Commercial, Road, Rail, Bridge, Metal
- Location
- Seattle, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Jose Rizal Bridge (North Segment)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Full lead abatement of the Jose Rizal Bridge including full removal of existing paint on steel members within full containment and full repaint of steel members. For the northern, SDOT-owned portion of the bridge, the superstructure, piers, strain poles, and railings are included in the scope of work. For the southern, WSDOT-owned portion of the bridge, only the strain poles and railings are included in the scope of work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Seattle |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Commercial, Road, Rail, Bridge, Metal |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
