Joule High Performance Compute Data Center Campus Power Supply
Sector: Energy Storage • Location: Utah, United States
Source: Microgrid Knowledge
Caterpillar and Wheeler Machinery have finalized an agreement with Joule Capital Partners to supply 4 GW of prime combined heat and power (CHP) and battery storage system to power a future data center campus in central Utah. The package includes Caterpillar's G3520K generator sets, equipment to provide electricity and capture waste heat for cooling, 1.1 GWh of grid-forming battery energy storage,
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT), Data Center
- Location
- Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Microgrid Knowledge
ConstructChat
Ask ConstructChat about Joule High Performance Compute Data Center Campus Power Supply
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Caterpillar and Wheeler Machinery have finalized an agreement with Joule Capital Partners to supply 4 GW of prime combined heat and power (CHP) and battery storage system to power a future data center campus in central Utah. The package includes Caterpillar's G3520K generator sets, equipment to provide electricity and capture waste heat for cooling, 1.1 GWh of grid-forming battery energy storage, and backup power from diverse fuel sources. The system will interconnect with the Intermountain West grid and directly connect to the data center campus. Caterpillar and Wheeler will provide technical services including design, installation, integration, testing, and commissioning. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Utah |
Source
Source | Microgrid Knowledge |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Data Center |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
