JP Morgan Chase Bank - Ashburn, VA
Sector: Power Generation (CCGT) • Location: Ashburn, Virginia, United States of America
Source: Dodge
Construction Of A New Commercial Banking Center With Thru Wall Drive Thru Atm, Canopy. The Scope includes Architecture, Structural, Mechanical, Plumbing, Electrical, And Solar Ready. civil Scope Submitted Under Separate Cover And Is Under Landlord Scope Of Work (Design And construction)
- Status
- Closed
- Sector
- Power Generation (CCGT), Solar, Commercial
- Location
- Ashburn, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about JP Morgan Chase Bank - Ashburn, VA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction Of A New Commercial Banking Center With Thru Wall Drive Thru Atm, Canopy. The Scope includes Architecture, Structural, Mechanical, Plumbing, Electrical, And Solar Ready. civil Scope Submitted Under Separate Cover And Is Under Landlord Scope Of Work (Design And construction) |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Ashburn |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
