logo

JPG creates full-time BIM role to fast track technology

Sector: Commercial • Location: Leeds, United Kingdom

Source: Highways Today

Project
Ongoing

Leeds based JPG Group has created a dedicated role to ensure a fast track compliance and company-wide operation in Building Information Modelling (BIM) Level 2 in just twelve months. BIM is a revolutionary 3D model based digital process that gives the construction industry the insight and tools to more efficiently plan, design, construct and manage buildings and infrastructure. JPG’s Civil and Str

Project Information FAQ

Project Information

3 Q
The project “JPG creates full-time BIM role to fast track technology” is an infrastructure initiative in the Commercial sector, located in Leeds, United Kingdom. Taiyo aggregates data on it from Highways Today.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Leeds based JPG Group has created a dedicated role to ensure a fast track compliance and company-wide operation in Building Information Modelling (BIM) Level 2 in just twelve months. BIM is a revolutionary 3D model based digital process that gives the construction industry the insight and tools to more efficiently plan, design, construct and manage buildings and infrastructure. JPG’s Civil and Structural Engineer, Tom White, who has a Master’s Degree in BIM, is leading a dedicated strategy alongside IT expert Kyle Knox to ensure that all 50 staff members are fully aligned in using BIM consistently and effectively. The immediate goal is to gain recognition in the industry through BIM Level 2 accreditation. Chris Harding, Managing Director at JPG Group, said, “As we align ourselves as more strategic advisors on whole site potential it is imperative that we are embracing BIM technologies to the highest potential so that we are working as one with clients to deliver better structures with a stronger bottom line.” Established in 1988, JPG employs a team of 50 industry experts and provides civil and structural engineering services for clients throughout the UK. It covers all major development sectors with expertise in every aspect of civil and structural engineering from initial site investigation, through design and construction, to the implementation of traffic management schemes. Recent instructions include the 90-acre Symmetry Park Darlington for db symmetry, and Skelton Gate in Leeds, a 170-acre joint venture development between Evans Property Group and Keyland Developments.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data