J.S. Mcdonnell Culvert Replacement
Sector: Water Supply and Storage • Location: Airport Township, Missouri, United States of America
Source: Dodge
Project consists for replacement of two elliptical pipe culverts, construction of concrete headwalls, reconstruction of portions of the paved ditch adjacent to the headwalls, sidewalk removal and replacement, and construction of concrete curb ramps and other incidental items along James. S. McDonnell Blvd. at Byassee Dr. and a commercial entrance within Hazelwood, MO.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Project consists for replacement of two elliptical pipe culverts, construction of concrete headwalls, reconstruction of portions of the paved ditch adjacent to the headwalls, sidewalk removal and replacement, and construction of concrete curb ramps and other incidental items along James. S. McDonnell Blvd. at Byassee Dr. and a commercial entrance within Hazelwood, MO. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
