JSW Group Copper Mining Project
Planned · Jharkhand · Last reported Jan 2025
Source: The Hawk
JSW Group is entering the non-ferrous metals sector by securing a Mine Operator and Developer (MDO) contract for two blocks of copper mines in Jharkhand. The project includes operationalizing the mines and setting up a copper concentrator plant with an investment of Rs 2,600 Crores.
- Status
- Prospective
- Sector
- Metal
- Location
- Jharkhand, India
- Updated
- 22 Jul 2026
- Source
- The Hawk
ConstructChat
Ask ConstructChat about JSW Group Copper Mining Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | JSW Group is entering the non-ferrous metals sector by securing a Mine Operator and Developer (MDO) contract for two blocks of copper mines in Jharkhand. The project includes operationalizing the mines and setting up a copper concentrator plant with an investment of Rs 2,600 Crores. |
Original sector | Mining |
Budget |
Location
Country | India |
State | Jharkhand |
Source
Source | The Hawk |
URL |
More Details
Record type | Project |
Sector | Metal |
Article published date | 2025-01-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Chuzachen Hydroelectric Power Project Sikkim
- Mahan I Power Project Madhya Pradesh
- Rampur Hydro Electric Power Project Himachal Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Kakrapar Atomic Power Station Expansion
- Haldia Dock Complex (4A Berth)
- Jindal Tractebel Power Company
