Juarez South-South Treatment Plant
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
In August 2009, Degremont, a subsidiary of the French group Suez, was awarded the 17-year contract to build and operate the wastewater treatment plant named PTAR Juarez Sur-Sur (Ciudad Juarez, state of Chihuahua). The treatment plant was set to have a capacity of 500 liters/second (43.2 m3/day), benefiting 180,000 people.
The sponsors established the special purpose company Tratamiento de Aguas R
- Status
- Prospective
- Sector
- Government, Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Juarez South-South Treatment Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In August 2009, Degremont, a subsidiary of the French group Suez, was awarded the 17-year contract to build and operate the wastewater treatment plant named PTAR Juarez Sur-Sur (Ciudad Juarez, state of Chihuahua). The treatment plant was set to have a capacity of 500 liters/second (43.2 m3/day), benefiting 180,000 people. The sponsors established the special purpose company Tratamiento de Aguas Residuales de Ciudad Juarez, S.A. de C.V. to lead the project. Detailed information on the award process led by the municipality was not available. The investment was estimated at US$ 42.3 million. The project was granted a US$ 9.3 million loan from the Nadbank, as well as an US$ 8.0 million grant through Border Environment Infrastructure Fund (BEIF), also funded by EPA and administered by the Nadbank. The loan was approved in March 2010, but its first disbursement occurred in September 2012. The remaining costs were financed with grants from the federal government (33%) and equity investment (26%). Construction works commenced in March 2012 and were concluded by March 2014. |
Original sector | Water and sewerage |
Budget |
Location
Country | Mexico |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Government, Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2024-09-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project