Juba-Jauru-Maggi-Nova Mutum Transmission Line

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Active

In September 2007, Consorcio Jauru, an association of the state-owned Eletrobras (45%), Terna Participacoes (35%) and the Bimetal (20%), was awarded in a competitive bidding process the 30-year contract to build and operate 386-km of transmission lines and two substations located in the state of Mato Grosso. The transmission lines were set to run across the municipalities of Juba,Jauru, Maggi and

Status
Prospective
Sector
Commercial, Government, Hydro, Power Generation (CCGT)
Location
Mato Grosso, Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Juba-Jauru-Maggi-Nova Mutum Transmission Line

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Juba-Jauru-Maggi-Nova Mutum Transmission Line” is an infrastructure initiative in the Commercial sector, located in Mato Grosso, Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In September 2007, Consorcio Jauru, an association of the state-owned Eletrobras (45%), Terna Participacoes (35%) and the Bimetal (20%), was awarded in a competitive bidding process the 30-year contract to build and operate 386-km of transmission lines and two substations located in the state of Mato Grosso. The transmission lines were set to run across the municipalities of Juba,Jauru, Maggi and Nova Mutum, allowing the transmission of energy generated by small hydro power plants located in the region. Besides Consorcio Jauru, four other companies took part in the first stage of the contest, though only two participated in the final stage of the process: Cymi Holding and Cobra Instalaciones y Servicios. The bidding criteria set by the federal regulatory agency ANEEL was the lowest required annual revenue. Consorcio Jauru presented the lowest offer, a total value of US$ 7.5 million (BRL 17.2 million), 53.5% the ceiling set by the regulatory agency. The contract was signed in March 2008, and the sponsors created the company Jauru Transmissora de Energia to lead the project during the 30-year contract period. The project company name was later changed into Brasnorte Transmissora de Energia S.A. In August 2009, the shareholding structure was modified as follows: Eletrobras (49.71%), Terna Participacoes (38.67%) and the Brazilian company Bimetal (11.62%). Terna Participações denomination was then changed into Transmissora Alianca de Energia Eletrica S.A. and is currently owned by Fundo de Investimentos em Participacoes Coliseu (33,6%), the state-owned Cemig Geracao e Transmissao S.A. (32,3%), Alterosa (29.42%) and other small investors (4.72%). The sponsor committed to invest US$ 109 million (BRL 218 million) in the transmission line. The construction works commenced in March 2008, but financial closure was only achieved in July 2009, when the sponsor was granted a US$ 61.7 million (BRL 123.4 million) loan from Banco da Amazonia. The remaining cost was set to be financed with the sponsors’ internal resources. Construction works were concluded in September 2009.

Original sector

Energy

Budget

Location

Country

Brazil

State

Mato Grosso

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Government, Hydro, Power Generation (CCGT)

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project