Juba-Jauru-Maggi-Nova Mutum Transmission Line
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
In September 2007, Consorcio Jauru, an association of the state-owned Eletrobras (45%), Terna Participacoes (35%) and the Bimetal (20%), was awarded in a competitive bidding process the 30-year contract to build and operate 386-km of transmission lines and two substations located in the state of Mato Grosso. The transmission lines were set to run across the municipalities of Juba,Jauru, Maggi and
- Status
- Prospective
- Sector
- Commercial, Government, Hydro, Power Generation (CCGT)
- Location
- Mato Grosso, Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Juba-Jauru-Maggi-Nova Mutum Transmission Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In September 2007, Consorcio Jauru, an association of the state-owned Eletrobras (45%), Terna Participacoes (35%) and the Bimetal (20%), was awarded in a competitive bidding process the 30-year contract to build and operate 386-km of transmission lines and two substations located in the state of Mato Grosso. The transmission lines were set to run across the municipalities of Juba,Jauru, Maggi and Nova Mutum, allowing the transmission of energy generated by small hydro power plants located in the region. Besides Consorcio Jauru, four other companies took part in the first stage of the contest, though only two participated in the final stage of the process: Cymi Holding and Cobra Instalaciones y Servicios. The bidding criteria set by the federal regulatory agency ANEEL was the lowest required annual revenue. Consorcio Jauru presented the lowest offer, a total value of US$ 7.5 million (BRL 17.2 million), 53.5% the ceiling set by the regulatory agency. The contract was signed in March 2008, and the sponsors created the company Jauru Transmissora de Energia to lead the project during the 30-year contract period. The project company name was later changed into Brasnorte Transmissora de Energia S.A. In August 2009, the shareholding structure was modified as follows: Eletrobras (49.71%), Terna Participacoes (38.67%) and the Brazilian company Bimetal (11.62%). Terna Participações denomination was then changed into Transmissora Alianca de Energia Eletrica S.A. and is currently owned by Fundo de Investimentos em Participacoes Coliseu (33,6%), the state-owned Cemig Geracao e Transmissao S.A. (32,3%), Alterosa (29.42%) and other small investors (4.72%). The sponsor committed to invest US$ 109 million (BRL 218 million) in the transmission line. The construction works commenced in March 2008, but financial closure was only achieved in July 2009, when the sponsor was granted a US$ 61.7 million (BRL 123.4 million) loan from Banco da Amazonia. The remaining cost was set to be financed with the sponsors’ internal resources. Construction works were concluded in September 2009. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
State | Mato Grosso |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Hydro, Power Generation (CCGT) |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project