logo

Jubail 3A Independent Water Desalination and Power Plant project in Saudi Arabia

Sector: Bridge • Location: Saudi Arabia

Source: InfraPPPWorld

Project
Closed

The project involves the construction of the Jubail 3A independent water desalination plant and integrated photovoltaic (PV) solar power plant in Saudi Arabia.The project site is situated on the Arabian Gulf Coast, approximately 18 km south of Jubail Industrial City. It is located adjacent to the existing plant units, namely Jubail Phase 1, Jubail Phase 2, and Jubail RO plants. The project include

Project Information FAQ

Project Information

5 Q
The project “Jubail 3A Independent Water Desalination and Power Plant project in Saudi Arabia” is an infrastructure initiative in the Bridge sector, located in Saudi Arabia. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the construction of the Jubail 3A independent water desalination plant and integrated photovoltaic (PV) solar power plant in Saudi Arabia.The project site is situated on the Arabian Gulf Coast, approximately 18 km south of Jubail Industrial City. It is located adjacent to the existing plant units, namely Jubail Phase 1, Jubail Phase 2, and Jubail RO plants. The project includes integrated water desalination and power plants, namely Plant 3A with a net capacity of 600,000 m3/day and Plant 3B with a net capacity of 570,000 m3/day of potable water. Plant 3A utilizes 60% Reverse Osmosis technology, while Plant 3B employs 40% Thermal Desalination technology.Additionally, the project includes the establishment of a 3,000 MW power generation capacity, along with the necessary infrastructure and supporting facilities.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data