Judson St Downtown Low Impact Development Demonstration PH 2
Closed · Washington · Last reported Aug 2024
Source: Dodge USA
This contract provides for the construction of approximately 360 feet of roadway along 9th Street, from Front Street south to Judson Street, and approximately 330 feet of adjacent alley, between 10th Street then easterly to 9th Street. Work includes the construction of pervious concrete sidewalks, roadway sections, and alleys, curb, gutter, and other pedestrian improvements. Low impact development
- Status
- Closed
- Sector
- Cement, Water Supply and Storage, Waste Processing and Treatment, Car parking, Road, Automotive, Government, Commercial
- Location
- Lynden, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Judson St Downtown Low Impact Development Demonstration PH 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This contract provides for the construction of approximately 360 feet of roadway along 9th Street, from Front Street south to Judson Street, and approximately 330 feet of adjacent alley, between 10th Street then easterly to 9th Street. Work includes the construction of pervious concrete sidewalks, roadway sections, and alleys, curb, gutter, and other pedestrian improvements. Low impact development stormwater improvements will be constructed along the roadway. Sanitary sewer and water main imp... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Lynden |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Water Supply and Storage, Waste Processing and Treatment, Car parking, Road, Automotive, Government, Commercial |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
