Juiz de Fora Power Plant
One of 1,077 projects Taiyo tracks in Minas Gerais.
Source: World Bank Group
The Juiz de Fora power plant's first phase came on line on November 25, 2001, and the second phase on December 6, 2001. The power plant is a 50/50 joint venture between Alliant Energy and Companhia Forca e Luz Cataguazes-Leopoldina. The later being 49.1% owned by Alliant Energy. In April 2006, Alliant Energy sold its stake in the company to Cataguazes-Leopoldina. The power plant's initial capac
- Status
- Closed
- Sector
- Oil and Gas, Wind, Power Generation (CCGT), Natural Gas, Commercial, Manufacturing (Industrial), Government
- Location
- Minas Gerais, Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Juiz de Fora Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | cancelled |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Juiz de Fora power plant's first phase came on line on November 25, 2001, and the second phase on December 6, 2001. The power plant is a 50/50 joint venture between Alliant Energy and Companhia Forca e Luz Cataguazes-Leopoldina. The later being 49.1% owned by Alliant Energy. In April 2006, Alliant Energy sold its stake in the company to Cataguazes-Leopoldina. The power plant's initial capacity is 80 MW using two turbines operating in single cycle mode. Once complete the capacity will total 103 MW. BNDES financed 80% of the initial $73 million project cost. EXIM bank is expected to provide additional long-term debt. In October 2007, Petrobras a state-owned oil company bought Juiz de Fora Power Plant. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
State | Minas Gerais |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Wind, Power Generation (CCGT), Natural Gas, Commercial, Manufacturing (Industrial), Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
