Julius Nyerere Hydropower Project
Sector: Hydro • Location: Tanzania
Source: IPP Media
The Julius Nyerere Hydropower Project (JNHPP) is designed to generate 2,115 megawatts of electricity, aimed at making electricity the primary energy source for cooking in Tanzania. The project is part of a broader initiative to reduce reliance on charcoal and firewood, which contribute to deforestation and climate change.
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT)
- Location
- Tanzania
- Updated
- 22 Jul 2026
- Source
- IPP Media
ConstructChat
Ask ConstructChat about Julius Nyerere Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Julius Nyerere Hydropower Project (JNHPP) is designed to generate 2,115 megawatts of electricity, aimed at making electricity the primary energy source for cooking in Tanzania. The project is part of a broader initiative to reduce reliance on charcoal and firewood, which contribute to deforestation and climate change. |
Original sector | Energy |
Location
Country | Tanzania |
Source
Source | IPP Media |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT) |
Article published date | 2025-03-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Tanzania
- Silverlands Tanzania Limited
- Tabora Water Supply Scheme, Tanzania
- Lower Kihansi Hydropower Dam and Reservoir Project
- Tanzania Electricity Supply Company (TANESCO)
- Alstom Power Rentals Mwanza
- Aggreko Ubungo and Tegeta Temporary Power Station
- PLANT
- GREEN MINI-MICRO GRIDS IN AREAS NOT CONNECTED TO THE NATIONAL GRIDS THROUGH PRIVATE SECTOR FINANCING WINDOWS
