Jungerman Hall Seismic Improvements
Sector: Car parking • Location: Davis, California, United States of America
Source: UC Davis
Jungerman Hall has been identified as a high priority, level VI rated, building for seismic improvements. Seismic Renovation The following scope will improve seismic safety while minimizing the impact to the interior of the building. Improve building strength in north-south direction with new buttress wall Improve building strength in east-west direction by filling in select clerestory windows Fir
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Jungerman Hall has been identified as a high priority, level VI rated, building for seismic improvements. Seismic Renovation The following scope will improve seismic safety while minimizing the impact to the interior of the building. Improve building strength in north-south direction with new buttress wall Improve building strength in east-west direction by filling in select clerestory windows Fire, Accessibility & Other Code Improvements The following scope will be executed in compliance with the National Fire Protection Association standards (NFPA), the California Building Code (CBC) and Americans with Disabilities Act Standards (ADA). Provide new automatic fire sprinkler and upgrade existing partial sprinkler system in the basement Select upgrades to the existing fire alarm system Install an accessible parking stall Update primary entrance door Install new concrete sidewalk and curb Update interior room signage Remodel existing restrooms and locker rooms (men’s and women’s) Electrical Panel Replacements Electrical panels that have reached end of life will be replaced to help support electrical needs throughout the building. When possible, this work may be completed on a separate timeline from the other project work to help alleviate outages during business hours. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
