Juniper Green Energy Solar Project at Karanja
Sector: Solar • Location: Karanja, Maharashtra, India
Source: Manufacturing Today India
Juniper Green Energy Ltd has commissioned an extra 43 MWp solar capacity at its Karanja site in Maharashtra, part of a larger 129 MWp hybrid power project. The total solar capacity now stands at around 103 MWp. The project was executed rapidly in two phases, completing 59.55 MWp on June 6, 2025, and approximately 43 MWp on July 14, 2025, ahead of the original schedule.
- Status
- Closed
- Sector
- Solar, Manufacturing (Industrial), Power Generation (CCGT)
- Location
- Karanja, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- Manufacturing Today India
ConstructChat
Ask ConstructChat about Juniper Green Energy Solar Project at Karanja
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Juniper Green Energy Ltd has commissioned an extra 43 MWp solar capacity at its Karanja site in Maharashtra, part of a larger 129 MWp hybrid power project. The total solar capacity now stands at around 103 MWp. The project was executed rapidly in two phases, completing 59.55 MWp on June 6, 2025, and approximately 43 MWp on July 14, 2025, ahead of the original schedule. |
Original sector | Energy & Power |
Location
Country | India |
State | Maharashtra |
City | Karanja |
Source
Source | Manufacturing Today India |
URL |
More Details
Record type | Project |
Sector | Solar, Manufacturing (Industrial), Power Generation (CCGT) |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
