Juniper Green FDRE Project
Sector: Solar • Location: India
Source: Power Peak Digest
Juniper Green Energy Limited has entered the commissioning phase of India’s first Firm and Dispatchable Renewable Energy project integrating 259 MWp solar, 280 MW wind, and a 200 MWh Battery Energy Storage System across Rajasthan and Gujarat. The solar component achieved commercial operations in March 2026, and BESS commissioning was completed in April 2026. The project holds a 200 MW PPA with SJV
- Status
- Under Construction
- Sector
- Solar, Energy Storage, Power Generation (CCGT), Wind, Commercial
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Power Peak Digest
ConstructChat
Ask ConstructChat about Juniper Green FDRE Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | commissioning |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Juniper Green Energy Limited has entered the commissioning phase of India’s first Firm and Dispatchable Renewable Energy project integrating 259 MWp solar, 280 MW wind, and a 200 MWh Battery Energy Storage System across Rajasthan and Gujarat. The solar component achieved commercial operations in March 2026, and BESS commissioning was completed in April 2026. The project holds a 200 MW PPA with SJVN Limited, backed by Haryana Power Purchase Centre. |
Original sector | Power |
Location
Country | India |
Source
Source | Power Peak Digest |
URL |
More Details
Record type | Project |
Sector | Solar, Energy Storage, Power Generation (CCGT), Wind, Commercial |
Article published date | 2026-04-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
