Juniper Green Stellar Solar-Wind Hybrid Project
Sector: Energy Storage • Location: Barmer and Devbhumi Dwarka, Rajasthan and Gujarat, India
Source: Law.asia
The project involves the development of a solar-wind hybrid renewable electricity project incorporating a battery energy storage system (BESS). It includes 468.30MW of wind capacity, 265MW of solar capacity, and 103MW of BESS capacity, located in Barmer, Rajasthan and Devbhumi Dwarka, Gujarat.
- Status
- Prospective
- Sector
- Energy Storage, Solar, Power Generation (CCGT), Wind
- Location
- Barmer and Devbhumi Dwarka, Rajasthan and Gujarat, India
- Updated
- 22 Jul 2026
- Source
- Law.asia
ConstructChat
Ask ConstructChat about Juniper Green Stellar Solar-Wind Hybrid Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the development of a solar-wind hybrid renewable electricity project incorporating a battery energy storage system (BESS). It includes 468.30MW of wind capacity, 265MW of solar capacity, and 103MW of BESS capacity, located in Barmer, Rajasthan and Devbhumi Dwarka, Gujarat. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Rajasthan and Gujarat |
City | Barmer and Devbhumi Dwarka |
Source
Source | Law.asia |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Solar, Power Generation (CCGT), Wind |
Article published date | 2025-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
