logo
ProjectBid Results

Jupiter Advanced Metering Infrastructure

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Design, furnish and install a turnkey Advanced Metering Infrastructure (AMI) system to replace the Town of Jupiter Water Utility s existing Automated Meter Reading (AMR) system. The AMI system shall be designed to improve customer experience, provide long term accuracy of water billing, improve meter reading efficiency, and provide the means to monitor flow throughout the distribution system. The

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Commercial, Power Generation (CCGT), Government
Location
Jupiter, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Jupiter Advanced Metering Infrastructure

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Jupiter Advanced Metering Infrastructure” is an infrastructure initiative in the Water Supply and Storage sector, located in Jupiter, Florida, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Design, furnish and install a turnkey Advanced Metering Infrastructure (AMI) system to replace the Town of Jupiter Water Utility s existing Automated Meter Reading (AMR) system. The AMI system shall be designed to improve customer experience, provide long term accuracy of water billing, improve meter reading efficiency, and provide the means to monitor flow throughout the distribution system. The AMI system to be installed under this contract shall include all the necessary components and ser...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Jupiter

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Commercial, Power Generation (CCGT), Government

Article published date

2025-08-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project